Project controls services that reach the decision.

We do not sell planning hours or pretty Gantt charts. We design routines, models and analysis so management knows what is likely to happen, what it may cost and what to do in time.

S/01

Planning

For projects that need a defensible baseline, a reliable critical path and a forecast management can use.

Deliverables

CPM programme, WBS/CBS/OBS, S-curves, lookahead, variance analysis, SPI/CPI, forecast and executive reporting.

  • Primavera P6
  • Baseline
  • Critical path
  • EVM
S/02

PlanBuilt Method

Implementation of a control methodology connecting contractual schedule, weekly commitments, constraints, physical progress and decisions.

Difference

The method does not replace Primavera or Last Planner. It connects them so contract and production can coexist.

  • CPM
  • Last Planner
  • Lookahead
  • Forecast
S/03

4D BIM

Schedule-to-model linking to validate sequences, explain interfaces and catch conflicts before they reach site.

Deliverables

4D simulations, constructability review, plan-vs-actual comparison and visual support for coordination meetings.

  • Synchro 4D
  • IFC
  • Navisworks
  • Digital twin
S/04

Reporting

Lightweight systems to capture real progress, validate field data and turn it into useful reporting.

Principle

Progress without traceability is not control: every percentage must be explainable.

  • Power BI
  • Python ETL
  • AppSheet
  • Looker
S/05

Delay Claims Support

Technical delay analysis and contract support based on the programme, real records and event traceability.

Objective

Quantify impact and responsibility with rigour, not just narrate what happened.

  • TIA
  • Windows analysis
  • EOT
  • Claims
Next step

Is your project on plan?

Tell us the current phase and what worries you about the schedule. We will come back with an honest first read.