Project Controls & Planning · EPC

Anyone can make a plan.
Few can control it.

We implement project controls systems that connect the contractual schedule with real site production, so the client knows whether dates are credible, which risks threaten milestones and what decisions must be made before delay becomes irreversible.

€30-150MTarget project size
Senior-ledDelivery model
ES · ENBilingual deliverables

S-curve — cumulative progress

Total project WeeksMonths
S-curve - Total project Weekly view - Data date 24/07/26 Incremental bars Cumulative progress (%) 0%25%50%75%100% 02.55.07.510 Data date 56.8% W01W03W05W07W09W11W12
W01Visible date rangeW12
BarsActualBaselineRemainingCurvesActual cumulativeBaseline cumulativeForecast cumulative
The problem

Planning often reaches the decision too late.

Many projects have Primavera, meetings and dashboards. Still, field data arrives late, progress is not traceable and the forecast becomes wishful thinking.

01

Reporting is not control

Moving dates and explaining the past does not protect margin, milestones or contractual position.

02

Site and office speak different languages

The contractual schedule needs real data: quantities, constraints, resources, productivity and releases.

03

Not every delay matters equally

Senior value is separating noise from real impact on critical path, cost and contract risk.

Services

One control system, not isolated services.

PlanBuilt integrates CPM planning, production control, field data, 4D BIM, forecasting and delay analysis.

PlanBuilt Method

Site → data → forecast → decision.

The method turns daily site activity into actionable information for management.

01

Model

WBS, baseline, progress rules, milestones and critical path.

02

Capture

Physical progress, constraints, resources, issues and evidence.

03

Analyse

Productivity, variance, consumed float and activities at risk.

04

Forecast

Realistic dates based on logic, performance and constraints.

05

Decide

Impact on time, cost, contract and recovery options.

06

Adjust

Re-sequencing, mitigation and weekly system learning.

Technical stack
Primavera P6MS ProjectSynchro 4DPower BIExcel MacrosSketchUp
Insights

Technical knowledge, not marketing.

Practical analysis on planning, project controls and delay analysis, integrated into the PlanBuilt blog.

Selection of technical articles published in the integrated blog.

Next step

Is your project on plan?

Tell us the current phase and what worries you about the schedule. We will come back with an honest first read.

Request a diagnostic
BaseSpain · Iberia + EU
FocusIndustrial EPC · Energy · €30M+